Project Information

Project Name: Buffalo Airport Deicing Fluid Treatment System

Location: Buffalo Niagara International Airport, New York (United States)

Project Type: Airport Deicing Fluid

Completion Date: June 2008

Treatment Objectives

  • Flow capacity increase 4500 m3/day (1.2 MGD)
  • Maximum daily loading: 4500 kg/day BOD5 (10,000 lbs/day)
  • Effluent Quality: 30mg/L BOD5

Buffalo Airport Deicing Fluid Treatment System

Buffalo Airport Deicing Fluid Treatment System

Project Background/Challenges

As per regulatory requirements, the collection, containment and treatment of waste de-icing fluid are the responsibility of Airport management not individual carriers. In an article published in airport Improvement Magazine (July-August 2009), it was noted that Buffalo Niagara International Airport (BNIA) spent in excess of $13 million dollars over four years in an attempt to meet regulatory discharge requirements .Despite the substantial investment, the airport was not able to meet its obligations and "continued to exceed allowable levels".

Faced with mounting operational costs and discharge limit violations, BNIA was quick to recognize the need for a cost effective solution. The challenge was to develop a management plan that incorporated either off-site or on-site treatment to handle the seasonal variation in flow and BOD concentration.

If an on-site treatment system was to be constructed, it could not pose a risk to travelers' safety by drastically changing the environment in and around the airport. This meant excluding alternatives such as lagoons or open tanks which have the potential for attracting birds and other wildlife.

NEI's Solution

Nelson Environmental Inc. (NEI), in collaboration with Urban Engineers, and Stantec designed a novel robust on-site treatment system that proved very cost effective in initial capital and O&M. The system can handle the high flush flow, low propylene glycol concentration of spring. During winter operations, the system is capable of handling the low flow high polypropylene concentration.

As an added advantage, the system was integrated with the stormwater management system to produce an effluent quality surpassing regulatory requirements on a year round basis.

The system comprises of vertical flow aerated gravel bed, a variation of Nelson Environmental's SAGR® (Submerged Attached Growth Reactor). Underground storage tanks are used to store and equalize flow prior to feeding the SAGR® process. Grit removal chambers between the equalization tanks and the SAGR® process remove particulate matter that could otherwise adversely affect process pumps and SAGR® hydraulics.

The gravel bed provides required surface area for BOD reducing hetetrophic bacteria to attach and grow. Air was introduced through NEI's FBA® LINEAR aeration system provides a minimum of 2 mg/L disolved oxygen throughout the bed. The design and operation of the system is loading dependent as opposed to hydraulically limited. As a result, the process can handle a high flow at low BOD concentration (up to 1.2 MGD); a condition typically seen during spring thaw and summer operation or treat high influent BOD5 (>1000 mg/L) at low throughput to an effluent quality 30 mg/L BOD5.

The bed is sized to ensure a balance between biomass accumulation and degradation. As a result, chances of long term fouling that would result in diminished hydraulic conductivity are minimized. Performance data of the vertical flow SAGR® is as seen in figure 2 below. The system is as seen in Figure1 below.

The data plotted in figure 2 shows performance of the BNIA treatment system over the course of approximately six (6) months. The loading to the system is highest during the coldest of the winter months (i.e. December – March), which is to be expected. Of interest though is the fact that loading during the remaining months is fairly low. Despite fact that bacteria are essentially starved for a better part of year, a vibrant and active biomass is maintained within the system to treat peak loading to 95%+ removal. The extent of biomass reduction in the summer is due to insufficient food supply and predation.

View Project Gallery

  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • Nelson Environmental
  • SAGR Bed Operating in April 2012